Gardena Industrial: Industrial Electrical Contractor on a 199,000 Sq Ft Building in Gardena, CA
Left Coast Electric is the electrical contractor on Gardena Industrial, a 199,000 sq ft industrial building in Gardena, CA, built with general contractor KPRS. Our underground and in-slab electrical work is coordinated with the methane barrier and the slab pours.
Get a Free Estimate → · Call (877) 960-1122
CA Lic #1105569 · Commercial & Industrial Electrical

Project Snapshot
- Project: Gardena Industrial
- Location: Gardena, CA
- General contractor: KPRS
- Building: 199,000 sq ft industrial building
- LCE role: Electrical contractor on the project
- Focus: Coordinating underground and in-slab electrical with the methane barrier and slab pours
Project Overview
Left Coast Electric (LCE) is a licensed electrical and low voltage contractor serving commercial and industrial projects across California, Nevada and Arizona. On Gardena Industrial, a 199,000 sq ft industrial building in Gardena, CA, we are the electrical contractor working alongside general contractor KPRS. The drone photos on this page show the foundation stage: the green and black methane barrier membrane going down, finished slab-on-grade sections, and rebar forms ready for upcoming pours.
Coordinating Electrical with the Methane Barrier
On sites that require a methane barrier, the electrical work below and within the slab has to be sequenced with the membrane installation and the slab pours. On Gardena Industrial, our team coordinates underground and in-slab electrical with the methane barrier and the pour sequence, working with KPRS and the other trades on site so the barrier, the electrical and the concrete come together in the right order.
- Underground electrical. Coordinated with the methane barrier installation on the foundation.
- In-slab electrical. Coordinated with the slab-on-grade pours and rebar forms.
- Trade coordination. Working with the general contractor, KPRS, and the trades on site.
Photo Gallery
Drone photos of the Gardena Industrial foundation, showing the methane barrier, finished slab-on-grade sections and rebar forms.








Frequently Asked Questions
What is Left Coast Electric’s role on Gardena Industrial?
LCE is the electrical contractor on the project, a 199,000 sq ft industrial building in Gardena, CA, with KPRS as general contractor.
Why does a methane barrier matter for electrical work?
Underground and in-slab electrical has to be coordinated with the methane barrier installation and the slab pours, so the work is sequenced with the membrane and the concrete.
Where does Left Coast Electric work?
We serve commercial and industrial projects in California, Nevada and Arizona.
Is the estimate free?
Yes. Send your plans or describe the scope and we’ll provide a free estimate.
Related Work and Services
Tenant Improvement Electrical → · Electrical Panel Upgrades → · See All Projects →
Planning an Industrial Project in California, Nevada or Arizona?
If you need an electrical contractor who coordinates with the GC and the other trades from the foundation up, send us your plans and we’ll provide a free estimate.
Get a Free Estimate → · Call (877) 960-1122 · info@leftcoastelectric.com
Left Coast Electric · San Dimas, CA · CA Lic #1105569
